We're expanding!

If you've been following our progress, you know we've begun an expansion on our existing building.  We're bursting at the seams, and more people are showing up at every service!  Our photographers are working hard to snap some photos each week so you can keep track of what's happening.  It's very exciting to watch our body grow and change! 

Before Construction

Here's our church yard before construction.  Big changes are coming, though!

Scroll down to see how we've progressed!

Week 1

This was our dirt work phase.

We had to get all that dirt out of the way to make room for the foundation for our new addition!

Construction   Construction

Construction

Week 2

Here is our terrific construction crew laying our foundation! 

It's pretty darn cold out there, but they're working hard for us!

Construction    Construction

Week 3

No pictures this week, but it looked a lot like week 2!

Week 4

Check it out!  We've got a floor (more or less).

Construction    Construction

Construction

Week 5

This is more like it.  We can actually walk on this!

Construction    Construction

Construction

Week 6

The walls are going up!

Construction    Construction

Construction    Construction

Week 7

The roof is on, but we're still working on those interior walls!

Construction    Construction

Construction    Construction

Construction    Construction

Construction

Week 8

Windows and doors this week, plus the start of a roof!

Construction    Construction

Construction    Construction

Week 9

A bigger church means more people, so we'll be improving our septic system, too!

Construction    Construction

Our roofing has arrived, too, and will be put on shortly (next week, maybe)!

Construction    Construction

Construction                Construction

And here's some inside shots of the wonderful guys who are running our electrical (plus some awesome shots of their work)!

Construction    Construction

Let there be light!

Construction    Construction

Week 9.5

Here's more shots of our wonderful crew, and in the pictures below you can see that they're starting on the roof and siding! It's starting to look like the rest of the church now!

Construction    Construction

Construction    Construction

Week 10

The siding is almost all the way up, and the guys are putting insulation in the walls!

Construction    Construction

Construction    Construction

Construction

Week 10.5

They started hauling in the drywall this morning, and they'll be done hanging it by Monday!  Here's some pictures of the ever-changing interior of the building, and a couple of shots of our faithful drywall guys! It's looking great!

Construction    Construction

Here's the light we photographed in week 9.

It's all growed up now (it's got a bulb and everything)!

Light

Here are Chris and Dave, working diligently as I type this!

Dave    Chris

Week 11

The drywall is all up, the roof is on, and we even have gutters!  Some of the following photos are a little boring (drywalled rooms, oooh), but use your imagination!  Soon we'll have paint and flooring!

Outside    Outside

Family Room    Family Room

Babiez Room   Tots bathroom

Restroom entrance    Walkers Room

Week 12

Nothing much changed, so we didn't take any photographs this week!

Week 13

Lots happening this week!  We're painting this week, and there's actually solid ground connecting the addition to the pre-existing ramp (see the picture of the door below - there used to be a big hole there)!

Porch   Dave

Jackie   Bathroom window

Here's where we're going to connect the two buildings:

Hole in the wall

In a couple of weeks, we'll be able to see our current Family Room through this space! We'll be knocking through this wall starting on March 8th!

Week 14

The painting's just about done, and we're installing toilets and flooring!  I know pictures of toilets aren't really exciting, but last week these were just holes in the floor!  Oh, and the heat is on (hence the picture of the heating duct).

Ladies Room 3rd Stall   Ladies Room

Ladies Room sink  Totz sink

Men's Room sink   Plumber

Men's room   Heating duct

Next week: KNOCKING THE WALL OUT!

Our planned new addition is highlighted in yellow in the image below. This construction will provide approximately 2000 SF of additional space, and it will enable us to have our nursery on the same level as our main Sanctuary. We will also have additional restroom facilities on our main level. These additions will provide seating for 50 more people at every service!  

  Plans

Check out our progress each week!